The engineers and the paperwork behind them
Procurement runs on evidence. Ask and we send our engineers’ qualification certificates and the company’s insurance schedule.
Fire engineers with an electrical team behind them
Every Praetor engineer who signs a certificate works to BS 5839-1 for fire detection and alarms and BS 5266-1 for emergency lighting. Ask and we send their qualification certificates before the first visit.
Praetor is part of SB Electrical Group, so a wiring fault on a fire alarm circuit is traced by our own team. You are not left waiting for a separate electrician.
Tell us the make of your panel when you ask for a price. If a building is locked to one brand, we say straight away whether we can take it on.
What the company carries
Ask for the insurance schedule and RAMS for your site before you sign anything.
- Qualifications
- Certificates sent on request
- Insurance
- £2m public liability and £2m product liability, schedule on request
- Company details
- On every quotation, contract and certificate
- Vetting and conduct
- Uniform, ID, site sign-in, RAMS before first attendance



What the work looks like
A three-phase distribution board we installed and terminated on a live job, feeding the fire alarm, the smoke detection, the boiler and the lighting circuits.
- Mid installation, conductors drawn in and ready to land.
- Finished and covered, main switch and 400V warning in place.
- Closed up, with the circuit schedule where the next person will look for it.
Running a tender? Send us your PQQ and we will return it complete, with evidence attached, within five working days.
Start the conversation